Bon Secours Phase 4 Theatre Suites Fit-Out

Bon Secours Phase 4 Theatre Suites Fit-Out

Client: Bon Secours Health Systems
Category: Medical
Size: 350m2
Architect: Liam Waldron Architect
Engineer: MRG Consulting Engineers
Surveyor: Kane Crowe Kavanagh.
Mech/Elec: JODA Consulting Engineers
Timeframe: 4 Months
Cost: €1.7M
Location: Strand Rd, Tralee, Co. Kerry

Eamon Costello(Kerry) Ltd were pleased to have been retained by Bon Secours Health Systems on a negotiated basis for the fit-out of two new theatre suites at their hospital in Tralee, to include associated preparation, scrub, disposal and anaesthetic rooms along with the installation of associated mechanical plant. The theatre fit-out came on the back of successfully completing the theatre structure in 2015.  These works required rigorous planning to develop a programme that was achievable, yet managed the integration, and disruptive elements sensibly to minimise disturbance to the adjoining live theatres. As main contractor Eamon Costello (Kerry) Ltd was responsible for complete delivery of the project including service and specialist co-ordination on the project such as installation of PACS viewers, Theatre canopy, lead lining, Laser shielding and system installation.


Awards & Accreditation

  • ICE Award Winners Cert 2024 Education Project1 Eamon Costello 2
  • VCR Logo 2022 2023
  • Irish Green Building Council
  • NSAI
  • safetcert
  • NSAI Certified
  • heritage
  • homebond
  • niso 1
  • links irishgeorgiansociety
  • CIRI